Search keywords: scale model building
Images found: 2
Images per page:
Images from Adobe Stock
Architect designing building plan on desk with blueprints and tools
Ancient Greek Temple Architecture.
Technical architectural drawing with floor plan and structural, alongside black brick with studs, vector cutout, design concept.
Professional Architect and Engineer Working on Building Designs, Blueprints, and House Models in Various Studio Scenes
Isometric AFrame House Construction Blueprint Illustration
Rolled architectural blueprints, a tall skyscraper model, drawing pencils, and a notebook with a floor plan sketch are arranged on a white surface.
Vector CAD design style house floor plan and elevations showcase modern architecture
Isometric View of Bus Station with Vehicles.
Detailed architectural plan of a complex urban environment with various buildings.
A visual representation of the startup growth and business scaling pyramid, illustrating different stages of development with distinct icons.
An architect carefully examines a detailed scale model of a modern skyscraper showcasing precision and thoughtful design planning
Construction worker examining blueprints at drafting table.
Miniature Wooden Boardwalk Shop Silhouette vector illustration
Woman Creating Architectural Models with Tools
A crafting table set up for building and painting a model airplane kit.
Boy Creates Future City With Model And Visions Of Success
Architectural blueprint of a modern building complex with surrounding landscape design.
Vector sketch illustration silhouette drawing architectural design site plan layout section view facade of a simple modern two-story house with scale size
Lighthouse and Cargo Ship Illustration.
Detailed Architectural Floor Plan Illustration.
Architectural Blueprint and Construction Elements.
Minimal architecture design illustration showcasing a modern building elevation with precise measurements
Architectural design layouts with isometric building illustrations and text
Detailed architectural drawing of a two-story residential building with symmetrical facade.
Modern Office Building Corporate Architecture.
54 Miniature lighthouse diorama, tilt-shift photography, coastal scene, rocky shore, tiny people figures, warm sunlight, selective focus, red and white striped lighthouse, scale model, detailed miniat
Architect examining floor plan with crane model in hand
Hexagonal building structure isometric view urban planning
Ancient ship.Trireme.Ancient greece.History.Culture.Black figure pottery design.
3D Rendering of Modern Building Construction Site.
Architectural door and window elevation drawings with detailed dimensions, sections, and frame styles. Includes line weight variations for design presentation.
Miniature Cityscape with Buildings and Vehicles.
Tiny Adobe Pueblo Home Silhouette vector illustration
Vector illustration of an architectural blueprint design for a modern house
Small wooden house model with porch and plants on white surface under blue sky
Vector icon sheet of various buildings and structures
Vector art of architectural blueprint of a sports complex with swimming pool and gymnasium
Vector sketch illustration silhouette drawing architectural design site plan layout section view facade of a simple modern two-story house with scale size
Buy a small white church model kit for hobbyists and miniature building enthusiasts find your perfect church kit
Black and White Scale Model Illustration
Isometric 3D city block model featuring multiple skyscrapers and green trees on a dark background for urban design.
Architectural Blueprint Project Plan Drawing.
Architectural Drawing Tools and Plans Isometric View.
Isometric construction planning icons set – blueprint, ruler, compass, map, grid, structure
Port cranes illustrated color poster
Detailed architectural cross-section of a modern residential building with annotated measurements from a side viewpoint
Three commercial building icons displayed in isometric layout
Isometric illustration of construction vehicles and equipment on a construction site.
Collection of Architectural Floor Plan Symbols and Furniture Layouts.
Industrial Mining Facility with Conveyor Belts and Processing Equipment.
A detailed 3D architectural model of a contemporary two-story residence with white walls and wooden accents, on transparent background. Professional scale model of a modern villa
Top down view of various interior design floor plans.
Small wooden house model with porch and plants on white surface under blue sky
Vector art of detailed architectural floor plan showing room labels and furniture arrangement
Professional Architect Working on Building Design Concept Sketch
Detailed Floor Plan Illustration of a Modern Apartment Layout.
Close-up view of a dark blue and gray architectural model with a crescent moon symbol on a white background.
Detailed City Map Urban Planning, Infrastructure, and Road Network Visualization
Miniature nighttime cityscape featuring a crane
Architectural professional in hard hat pointing at a building model holding blueprints on white background
The image shows a minimalist, abstract architectural model of a castle or fortress rendered in white and red.  The model features high walls, a central gate, and a large number of small,
Hand holding pencil drafting building plan
Vector 2D CAD drawing of an airplane on a runway with terminal buildings and control tower.
City urban planning architectural model.
A confident architect presents a meticulously crafted scale model of a modern high-rise building and urban development project, highlighting innovative design.
Creative architect presenting a scale model of a futuristic building concept in his modern design studio
Detailed Architectural Model of Building.
Gray Scale Line Drawing of Modern Building
Miniature city model with roads and buildings.
Collection of various house and building icons in different styles and designs
Architectural Floor Plan and Elevation of a Residential House with Garage and Garden Area
Architectural floor plan drawing with elevations.
Woman in hijab presenting architectural model on tray smiling
Architects working on building design project in city.
3D Rendering of Building Under Construction.
3D rendering of architectural building blocks with pastel colors and varied designs.
Isometric Construction Site with Buildings and Machinery.
Detailed wireframe drawing of a modern city skyline with numerous skyscrapers and urban infrastructure.
Modern office floor plan layout.
architectural blueprint, technical drawing, construction plan or project on the blue background. stock vector illustration eps10
Detailed architectural blueprint of a modern residential building layout
Architectural blueprint with construction crane and design elements, detailed illustration.
Isometric city elements including streets, buildings, trees, parking lot, and power infrastructure
Construction Site with Pond and Trees.
A conceptual 3d render of an architectural house model in a box, ideal for design and building project illustration
Modern architectural design showcasing a contemporary building structure with a unique aesthetic appeal.
Collection of Architectural Floor Plans and Building Designs.
Isometric illustration of a modern house under construction with exposed framing and landscaping.
Seamless vector illustration of a digital blueprint showing the architecture and engineering plan for a house construction on a drawing board
Modern architectural model with brown and gray details on a textured gray background
Isometric View Collection of Sixteen Gray Scale Suburban Houses Various Architectural Styles Roof Designs and Details
A detailed scale model showcases an ancient structure with columns and a modern building featuring multiple windows, set on a green base. A digital rendering enhances the presentation
Couple Building Miniature Town, Creating a Playful, Collaborative Community.
Next page
/ 10