Search keywords: tábor
Nalezeno obrázků: 362
Obrázků na stránce:
Obrázky z Adobe Stock
3D isometric illustration of military communication buildings with watchtower, radar antennas, control center, surveillance base, and defense facility
Isometric military base illustration with vehicles, soldiers, watchtower, tents, armored trucks, artillery, buildings, detailed 3D army equipment collection
Military base silhouettes, tanks, helicopters, radar towers, army buildings, war equipment, armored vehicles, barracks, defense icons, vector illustration
Military base silhouettes featuring soldiers, army tanks, fighter jets, factory industrial plants, tents, medical evacuation, and national flags on white background
Historical Military Camp Icons. Line style icons of historical military camps: leather tent, campfire with pot, wooden stool,
Military Training Camp

A flat vector illustration of soldiers training at an army camp. Scenes include push-ups, obstacle climbing, and running drills.
Military base and defense facility silhouette set featuring tanks, missile launcher, helicopter, guard towers, barracks and army camp elements in black vector illustration isolated on white
Modern vector illustration of military base with barracks and vehicles, ideal for defense infrastructure, security operations, and military organization concepts
military base and army camp icon set vector
Isometric military base camp with tents, trucks, watchtower, and storage in desert environment, ideal for strategy games or logistics design.
Bunker icon. Military shelter symbol. Underground defense and protection collection. Flat Icon
Military command tent illustration, soldiers planning strategy, army communication base camp, tactical operation planning scene, vector silhouette, war preparation concept, outdoor field mission.
Military soldier silhouette with helmet boots dog tag backpack and tent vector illustration
Military and defense isometric icons set – 3d, army, and security symbols
Tent providing camouflage for an army camp or outdoor shelter
Lines of barbwire as a seamless bg. Black razor wire on white background. No entry security concept. Army camp. Jail fence. Vector illustration
Army Camp - Tactical Symbol
Diorama of a military base with tanks, radar tower, and guard posts, illustrating a secure military facility with essential defense equipment Military icon set
Isometric military base illustration, army logistics compound, tactical vehicles, defense infrastructure, training facility, security operations, strategic command center
Army Military Base  icon
Military and security line icon set. Vector pictograms of government building, army camp, digital security, rifle, border post, military truck, dog tags, and cannon, thin linear illustration.
Silhouette vector illustration of military soldiers with rifles, army tent, map reading, field planning, patrol communication, defense strategy, tactical operation
Military base silhouette collection with tanks, helicopters, watchtowers, buildings, vehicles, tents, soldiers and command centers isolated on white background
Isometric military base illustration with vehicles, personnel, training facilities, command buildings, and operational infrastructure representing defense operations
Preparing For The Mission Man Communicating By Radio At Army Camp Site
tepee al tramonto
military base outpost doodle black vector ink sketch
Modern vector illustration of military base with barracks and vehicles, ideal for defense infrastructure, security operations, and military organization concepts
military camps and prison fences silhouette set
Isometric desert military base with armored vehicles, tents, and watchtower on pink terrain for game design assets
Military tent icon set with star symbol for army camp or outdoor shelter isolated on a white background
Military base and army equipment silhouettes including truck watchtower barracks armored vehicle helicopter and field tent, defense infrastructure elements isolated on white background
Web
Military Headquarters Building with Outdoor Camp Tents - AI Generated
Row of military camping tents set up in a field illustration
Tangled barbwire graphic seamless bg. Black squiggly razor wire on white background. No entry security concept. Army camp. Jail fence. Vector illustration
Military soldiers setting up army tents silhouette illustration, camping shelter assembly sequence, outdoor survival, tactical field operations concept
Force Deployment Modern and clean web banner illustration featuring thematic icons for visual communication
Next page
/ 10