Search keywords: příruba
Nalezeno obrázků: 2
Obrázků na stránce:
Obrázky z Adobe Stock
Set of industrial bushing types, including split, flanged, perforated, and plain bearings, detailed isometric illustrations
Industrial pipe fittings set including elbows, tees, reducers, and flanges
Round flange glyph icon. Simple solid style for web and app. Vector illustration isolated on white background. EPS 10
France flag, illustrator vector eps8.
Water pipes with flange. Black icon.
Steel or metal flanges vector icon. May called plate or ring. Component part for fastened, connection and close end pipe to pipe or valves by screw bolt in pipeline construction and plumbing.
Industrial plumbing pipe system set, metal pipeline valves connectors collection, mechanical engineering utilities infrastructure pipes illustration elements
Isometric view of a large pipe with flanges being worked on by a group of construction workers on a platform
Engine air intake components displayed as icons on dark background
Industrial Pipe Flanges and Connectors in Black and White
Collection of automotive drivetrain and suspension components icons
Set of industrial waveguide flange icons for microwave engineering and telecommunications equipment design isolated on white background
Team of industrial workers doing pipeline installation and maintenance. Two plumbers in hard hats with wrench and drill repairing a yellow gas pipe system in a factory plant.
Industrial expansion joint with flanges and bellows for piping systems
Fire hydrant base flange A realistic fire hydrant base flange with bolt holes and circular mass, shown in three views including top view, side profile, and
Butterfly valve A circular butterfly valve with central disc and mounting flange displayed in frontal view, side profile, and three-quarter perspective to
Plain or flat washer isolated realistic icon. Vector metallic industrial joint or flange, vehicle spare part. Metal ring gasket, mechanical seal to prevent leakage of object under compression
Industrial gas pipe with valve and flange connections
Romantic illustration of a groom lifting the bride in his arms
An industrial worker is fastening flange on white background.
Automobile Exhaust Manifold Collection Black Vector Silhouettes. Engine parts, car components exhaust system.
Pipe puzzle
pipes parts collection. Vector illustration for any designs
Industrial pipe flange with bolt holes and a connecting pipe section
Equipment vessel tank for oil and gas industrial.
Silhouette of a worker turning a large valve on a pipeline with flanges in a monochrome image style
Close-up of industrial metal pipes with flanges and bolts, connected to form a network, depicting plumbing, oil, gas, or chemical systems.
Flange Icon
silueta, princesas, xv, boda, vestido de novia, vector, moda, ilustracion, quinceañera, iconos, bride, novia, novios, matrimonio, modelo
Crane hook with metal beam icon.
Technical drawing CAD stylized industrial pipe component or flange assembly, part of a pressurized system, HVAC technology
The principle of dismantling piping connections.
Isometric engineering drawing featuring pipes flanges gears and architectural plans in black and white lines
Pipe fittings line icons set, plumbing connectors, industrial pipeline valves, pipe joints collection, plumbing equipment outline vector illustration
Metal Pipe Flange Bearings Collection Industrial Mechanical Mount Components Color Variations Vector Illustration Set
Pipe connection joint vector icon. That metal or steel pipeline with bolt, screw and flange fitting. Part element for pipeline construction to transportation water, oil, natural gas and sewage.
Vector mechanical part of machine - flange.
Engineering assembly drawing of steel device
with dimension lines. Industrial technic 
cad scheme on paper sheet. Machined tool
with through holes.
Minimal wedding arch icon set cartoon vector of romantic ceremony decorations
Sketch of a bride and groom standing together for invitation
Isolate assembly flange on white background (4 holes)
Aerospace nutplates, anchor nuts icons. Isometric view engineering hardware elements and fixing base with screw threads design.
Ware pipe silhouette. Water tube pipes system, pipeline fittings, filters and pipe connectors silhouettes vector illustration icons set. Connector pipeline equipment silhouette, group illustration
Plumbing line icons set, outline vector symbol collection, linear style pictogram pack. Signs, logo illustration. Set includes icons as valve, toilet, plumber, pipes, bathtub, wrench, washer machine
Types of Pipe Flanges Vector Set: Welding Neck, Slip-On, Socket Weld, Threaded, Blind, Lap Joint, Orifice, Reducing
Silhouette of industrial plumbing system with various pipes, valves, and flanges
Two polished metal grommets with wide flanges presented side by side for detailed examination
A construction worker in a yellow hard hat working on a large pipe with flanges on a construction site area
Industrial pipe valve with wheel handle
Minimalist pipe section icon with flanged ends
Industrial heat exchanger with multiple tubes and flanges, designed for efficient thermal transfer in various applications.
Letter E industrial style logo 3d metallic construction pipe shape with flanges forms, silver colored creative typography identity, logotype technology design.
Heat exchanger.
Mechanical components vector set — electric motors, pumps, fans, valves, flanges, and couplings in schematic line style for industrial systems
a detailed black and white illustration depicting a valve with flanges and a handle showcasing a clean industrial design silhouette
doodle flange nut seamless pattern on black white background for print on packaging, stationery, merchandise.  retro flange nut fastener pattern background. pattern of flange nut line icon background
Creative vector illustration of plastic water, oil, gas pipeline, pipes sewage isolated on transparent background. Art design abstract concept graphic ells, gate valve, fittings, faucet element
Vintage Grunge Vintage medieval flanged mace with chain and spiked ball next to wooden shield
A close-up of industrial metal pipe components reveals detailed polished flanges and sturdy fasteners held together by many bolts
Hand drawn bride throwing a wedding bouquet
Isolate assembly flange on white background (8 holes)
Set of black silhouette industrial spare parts including flange, gear, and bearing
Pipeline concept flat design background on yellow. Vector illustration
Set of yellow elements of the pipeline. Gas and oil industry. Vector illustration.
solid icon isolated rebuilt transmission core test bench adapter rebuilt transmission core dyno flange rebuilt transmission core balance s rebuilt transmission core center support rebuilt
Technical drawing of a mechanical flange with detailed measurements and multiple views on a clean white background from various viewpoints
Romantic wedding arch cartoon icon set with floral party decorations for marriage ceremony
Valve, taps, pipe connectors, pipe details vector icons set. Set of pipe on white background
Plumbing pipe with valve, pipeline part of water supply and drain system of construction industry
Industrial valve. Vector rendering of 3d
Pipe icon and flange fitting. Include control valve and metal hose or flexible metal. For pipeline construction to transportation liquid or gas i.e. oil, natural gas. Also for sewage, plumbing etc.
Bold letter S logo monogram 3d metallic pipe with flanges smooth shape, silver creative industrial tech logomark, typography design element.
A cartoon illustration of an orange and blue industrial pipe system with a valve, fittings, and two circular components.
Gear, flange and synchro ring. Thin line icons
Industrial valve with flanges and wheel handle a striking black silhouette
Triangular realistic steel flange with circular grooves. Vector
Industrial pipeline system with manual valve wheel and flanges in vintage engraved drawing illustration
Industrial blue steel pipe with flanges and bolts vector illustration.
Bride and Groom in Convertible Car with Balloon
Bride and Groom decorative lettering for wedding signage
Isolate flange on white background (4 holes)
Automotive parts illustration, drivetrain components vector art, car repair parts diagram, isolated auto components
A comprehensive collection of plumbing fixtures and pipe connections for various industrial and residential applications
Oil, gas or water flowing through pipe. Pipeline construction with valve isolated. Industrial system. Vector illustration.
A long black pipe with flanges on a white background, representing industrial transport
A detailed illustration of a pipe with a valve and flanges for industrial use.
Mechanical parts and industrial components vector icon set featuring various engineering elements like gears, flanges, and bushings for design projects.
Illustration of an industrial pump with pipes and flanges mounted on a concrete base and support structure
Ship stern tube assembly, marine propulsion system, tail shaft, propeller, seals, bearing, coupling flange
Element with straight pipe flanges
Pipe icon and flange fitting. Include control valve and metal hose or flexible metal. For pipeline construction to transportation liquid or gas i.e. oil, natural gas. Also for plumbing and irrigation.
Industrial pipeline valve with handwheel and flanges for fluid control in engineering and manufacturing
A colorful pipe system with many different colored pipes
Título negro de bride to be
Set of steel pipes with flanges, 3D vector illustration.
Flange and ball bearing. Bearing cap. Vector illustration on white background.
Rohre20212a
Vector illustration of industrial pipelines with bolted flanges and control valve elements
Elegant Bride and Groom Wedding Couple Romantic Portrait
Isometric industrial pipeline with red valve. Vector illustration of a closed loop pipe system for oil, gas or water. Plumbing network with flanges for flow control and regulation.
Isolate flange on white background (3 holes)
Next page
/ 10